Most bad smart-switch orders are not a bad product — they are a spec that skipped a question until after the order shipped. This checklist puts the variables a B2B buyer needs to lock in the order they should actually be decided, so an RFQ arrives at a supplier's desk answerable in one pass rather than three rounds of clarifying questions.
1. Wiring reality, before anything else
Confirm whether the switch boxes at the target site have a neutral wire. This single fact determines which module families are even viable, and it is far cheaper to check with a simple site audit than to discover it after a batch has shipped. See our neutral vs no-neutral guide for what changes in the spec depending on the answer, and for retrofit projects, sample more than one unit — wiring is not always consistent across an older building.
2. Protocol: match it to install density and hub tolerance
Decide whether the project can support a gateway. Scattered single units (short-let apartments, individual retail stores) usually default to Wi‑Fi; dense multi-device rooms or whole-building rollouts (hotels, villas, large offices) more often justify a Zigbee or similar mesh with a shared gateway. Our Wi‑Fi vs Zigbee comparison and protocols overview cover the decision factors in more depth — density, hub tolerance and after-sales load are the three that matter most.
3. Certification for the target market
Certification requirements are market-specific and sometimes region-specific within a market (for example, Northern Ireland's requirement under the Windsor Framework for a CE mark even where UKCA is also used). Confirm what documentation is available for a given SKU and target market before ordering — see our certifications page — rather than assuming one certificate covers every destination.
4. Account and control model
Decide who actually controls the switch day to day: an individual occupant (residential, villa), an operator with centralized admin control (student housing, senior living, serviced apartments), or shift staff needing a physical fallback regardless of app status (retail, hospitality). This decision shapes which SKUs and app platforms are even appropriate, and it is worth deciding before finish or protocol, not after.
5. Finish, gang count and durability tier
Match the finish and gang count to the project tier — a villa or luxury project usually wants more finish options and higher gang counts, while a cost-sensitive, high-volume project (student housing, budget retail) usually wants a narrow, durable standard SKU. Ask for actuation life or durability figures on the specific SKU when the application involves heavy daily use.
6. Standardization and reorder consistency
For any multi-unit or multi-site order, decide upfront whether the goal is one standard SKU across the whole portfolio (usually yes, for maintenance and spares reasons) and confirm the same protocol, app brand and firmware line will still be available on a future reorder. A model name alone does not guarantee this — state it explicitly.
| Step | Question to answer first |
|---|---|
| 1. Wiring | Is neutral present at the switch box, checked on-site? |
| 2. Protocol | Can this project support a gateway, or must it be hub-free? |
| 3. Certification | Which target market(s), and what documentation is required there? |
| 4. Control model | Who actually operates the switch day to day? |
| 5. Finish/durability | What tier does this project sit at, and what actuation life is needed? |
| 6. Standardization | Is this a one-off order or the first of a recurring reorder? |
7. OEM/ODM needs, if any
If the project needs custom branding, packaging, or a finish outside the standard catalogue, flag this early and separately — it changes minimum order quantity and lead time in ways a standard-catalogue quote will not reflect. See our OEM/ODM page for how customization scope gets confirmed.
Putting it in the RFQ
An RFQ that answers these seven points — wiring, protocol, certification target, control model, finish/durability tier, standardization intent, and OEM scope — is answerable by a supplier in one pass. Anything left blank tends to come back as a clarifying question, which is the main source of delay in switch sourcing at this scale.
Ready to turn this checklist into a quote?
Answer these seven points in your RFQ and our trading desk will confirm the spec against current production batches.
Start RFQTurning the Checklist Into Your RFQ Template
The fastest way to use this guide is to convert it into a standing RFQ template — the same fields, in the same order, sent to every supplier. Frame standard and destination market. Protocol family and gateway scope. Gang mix as quantities. Certification marks required and documents requested. Load types and ratings. Customization tier. Packaging specification. Sample expectations. A template does two jobs at once: it makes quotes comparable across suppliers, and it signals to every factory that the buyer knows the category — both of which improve the quality of what comes back.
Keep the template in the order file and revise it once a season with what the last order taught. The checklist that survives three orders is worth more than any guide, because it is written in your markets specifics. A consolidating desk will maintain the template with you — it sees the fields that factories answer well and the ones they dodge, which is a map of where your attention earns its return.