Sourcing operations · multi-factory · QC gates

Manufacturing Capability — How PanelLink Runs Your Order

PanelLink is a trading platform, not a single factory: one specification, matched to the right partner factory line — with QC gates held from sample approval to container loading.

Positioning

One spec, matched to the right factory line

What PanelLink is

A trading platform that consolidates a pool of audited partner factories — wall switches, scene panels, gateways, sensors and 12V DC panels each come from lines that already build that category at volume. We do not claim one owned plant; we hold the specification, the sample standard and the QC gates instead.

What that means for buyers

One RFQ covers several product lines; one quote returns factory options, lead time and packaging; one shipment consolidates goods from more than one factory with aligned carton marks. You deal with one desk instead of vetting each plant yourself.

Why this matters: category-specialised factories beat generalists on yield and consistency. Matching the spec to the line that already builds it is the core of the model — not reselling a fixed catalogue.
Production sequence

Six steps from spec to shipment

The sequence below is the order narrative written into PO language. Skipping a gate is where most failed first orders begin.

1. Specification confirmation

SKU, protocol, plate standard, certifications, packaging and legends are locked into a written spec sheet with sample references. Changes after this point run as change orders, not verbal notes.

2. Sample approval

A golden sample is approved and retained by both sides, with a photo archive. The production clock starts at sample approval date — not at RFQ or PO date.

3. Incoming material inspection

Key inputs — glass and frames, PCBA, relays, radio modules — are checked at factory intake against the BOM. Batch traceability is recorded so any issue can be isolated to a lot.

4. Production with in-line QC

Assembly runs with checks at defined stations: appearance, function and firmware/app binding per the line QC plan. Defects are pulled at the station, not discovered at packing.

5. Ageing & functional testing

Finished units run ageing cycles and full functional testing before packing; failures are re-tested or scrapped. Test scope per order is agreed at the spec stage.

6. Packing & shipment

Export cartons, carton marks and language inserts per the approved pack spec. Loading supervision is available, and multi-factory orders ship consolidated with aligned marks.

Capability table

What the partner network covers

Narrative scope, not nameplate figures — lead time and batch size are confirmed per order at quotation.

CapabilityCoverageBuyer notes
Product linesWall switches, multi-scene panels, gateways, sensors, curtain control, smart sockets, 12V/24V DC touch panelsMixed-line orders are quoted as one package
Protocols & appsWi-Fi, Zigbee and Matter-ready options per SKU; app platforms per product lineProtocol context: Protocols
Plate standards86-type, EU, US and UK frames across wall linesState destination market; frame and box depth differ
Certification assistanceDestination cert lists confirmed in the RFQ; certificate availability per SKU; document support for registrationDetail: Certifications
OEM / ODMLogo print, colour family alignment, icon sets, private-label app on higher MOQProcess detail: OEM/ODM
Packaging customisationGift box vs bulk carton, language inserts, barcodes, carton marks, drop-test needsApprove the pack sample with the product sample

Capacity and lead time vary by factory and season — we quote them per order rather than publishing averages. Related: 12V/24V DC panel line · product catalogue.

Quality control

QC you can write into the PO

AQL by agreement

Inspection level and AQL are agreed and written into the PO language. Sampling follows the agreed plan; acceptance criteria are set before production starts, not argued at the dock.

Line photos & video on request

Production progress photos, packing photos and video walk-throughs are available at defined milestones, so buyers can see the line state without flying in for every batch.

Third-party inspection optional

Buyer-arranged third-party inspection is welcome. We coordinate factory access and, where findings require it, rework and re-inspection before release.

40+Audited partner factories
8,000+Product SKUs
12 yrsIn export
50+Export markets
FAQ

Manufacturing questions from new buyers

Are you a factory or a trading company?

A trading platform, honestly. PanelLink consolidates 40+ audited partner factories into one order desk and does not claim a single owned plant. Each order is matched to the factory line that already builds that category, under our spec and QC gates.

Which factory builds my order?

The line is selected by category, protocol and schedule when we quote. The manufacturing site is identified in your order documentation, and factories are audited per product category before they join the pool.

Can I inspect goods before shipment?

Yes. AQL levels are written into the PO language, production and packing photos or video are available on request at defined milestones, and buyer-arranged third-party inspection is welcome.

What happens if goods fail inspection?

Rework, re-inspection or replacement per the agreed AQL and PO terms, settled before shipment. Claim windows after delivery follow the sales agreement for the order.

RFQ

Send your spec — we map it to factory lines and quote

Product line, protocol, destination market and quantity are enough to start. Typical reply within one business day (indicative).

Start an RFQ
Related

Pages that complete the manufacturing story